With a prefabricated structure in Lausanne, the building execution was primarily scheduled with the drainage of the Rhône during spring 2021. We wisely used this time to fix the foundations and install the stairs and sub-structure. On top of that, we attached the six floaters and waited for the water of the Rhône to rise again.